Talleres Serra: Gantry Crane Tandem
New project for the design, installation and maintenance of a group of three pairs of bridge cranes with possible tandem operation (master-slave) for Talleres SERRA S.L.
This group of cranes allows the manipulation of large loads, thus perfectly adjusting to the customer’s production process thanks to the tandem operation system.
This practical system allows each pair of cranes to work with one, with another or with both cranes at the same time. In this way, large loads can be manipulated efficiently and easily.
Thanks to these equipments, VINCA adapts and satisfies the needs of the client, with a practical and profitable solution.